Our Projects
Discover our projects
Infrastructure, Pump Stations and Roads
Infrastructure, Pump Stations and Roads
UNHCR
Construction of water supply development project in the north of Lebanon
UNHCR
Construction of water supply development project in the north of Lebanon
UNRWA
Reconstruction of Nahr El Bared Palestine Refugee Camp Block N8, N6, mosque, and N18 and infrastructure work At Nahr el bared Camp.
UNRWA
Reconstruction of Nahr El Bared Palestine Refugee Camp Block N8, N6, mosque, and N18 and infrastructure work At Nahr el bared Camp.
UNRWA
Reconstruction of Nahr El Bared Palestine Refugee Camp Residential and Non - Residential Units - lot 12(Blocks N31 & 33).
UNRWA
Reconstruction of Nahr El Bared Palestine Refugee Camp Residential and Non - Residential Units - lot 12(Blocks N31 & 33).
UNRWA
Construction of sewerage, Drainage, and Water Systems in Ein El-Hilweh Palestinian Refugees Camp, sector No.2, Lebanon.
UNRWA
Construction of sewerage, Drainage, and Water Systems in Ein El-Hilweh Palestinian Refugees Camp, sector No.2, Lebanon.
UNRWA
Construction of sewerage and Drainage Systems in Rashidiyeh Palestinian Refugees, Camp, Lebanon
UNRWA
Construction of sewerage and Drainage Systems in Rashidiyeh Palestinian Refugees, Camp, Lebanon
GVC
Construction Of Water Supply Systems Improvement In Baalbek Governorate
GVC
Construction Of Water Supply Systems Improvement In Baalbek Governorate
UNDP
Provision of Civil Works for the Construction of Transmission and Distribution water Networks for Hnaider, Qarha & Knaise villages in Wadi Khaled, North Lebanon
UNDP
Provision of Civil Works for the Construction of Transmission and Distribution water Networks for Hnaider, Qarha & Knaise villages in Wadi Khaled, North Lebanon
UNHCR
Construction Works of six Water Reservoirs in Mount Lebanon Area
UNHCR
Construction Works of six Water Reservoirs in Mount Lebanon Area
CISP
Rehabilitation and extension of the potable water network in Majdlaya (Zgharta district- north Lebanon)
CISP
Rehabilitation and extension of the potable water network in Majdlaya (Zgharta district- north Lebanon)
UNDP
Rehabilitation of Irrigation Canals and Networks Using labour - Intensive Approach - Nahr Ibrahim, Fidar, Halet, Jbeil, and Amshit, Mount Lebanon
UNDP
Rehabilitation of Irrigation Canals and Networks Using labour - Intensive Approach - Nahr Ibrahim, Fidar, Halet, Jbeil, and Amshit, Mount Lebanon
CARE Lebanon
Rehabilitation of existing water pumping stations in Yannouh – South Lebanon
CARE Lebanon
Rehabilitation of existing water pumping stations in Yannouh – South Lebanon
UNDP
Construction of Concrete Irrigation canals and Networks in Tal Maayan & Tal Abbas Charqi, Akkar
UNDP
Construction of Concrete Irrigation canals and Networks in Tal Maayan & Tal Abbas Charqi, Akkar
Lebrelief
Implementation of Water Network in Qloud Kobbeh / Implementation of Ductile Iron in Tabbaneh / Rehabilitation of El Shok Water Network System – Tripoli
Lebrelief
Implementation of Water Network in Qloud Kobbeh / Implementation of Ductile Iron in Tabbaneh / Rehabilitation of El Shok Water Network System – Tripoli
CISP
Extension Of The Water Supply System In El - Fouar
CISP
Extension Of The Water Supply System In El - Fouar
GVC
Construction and Upgrade of Jabal Akroum Water Supply System In El Bsatine, Qenye, Mrah El Kaukh – Jabal Akroum, Akkar - Lebanon
GVC
Construction and Upgrade of Jabal Akroum Water Supply System In El Bsatine, Qenye, Mrah El Kaukh – Jabal Akroum, Akkar - Lebanon
UNDP
Construction of Irrigation Canal and Pipeline Networks Using Labour - Intensive Approach – Assoun – Denniyeh – North Lebanon
UNDP
Construction of Irrigation Canal and Pipeline Networks Using Labour - Intensive Approach – Assoun – Denniyeh – North Lebanon
INTERSOS
Rehabilitation of Aitit pumping sets and construction of transmission line to Aitit reservoir
INTERSOS
Rehabilitation of Aitit pumping sets and construction of transmission line to Aitit reservoir
UNDP
Construction of Irrigation Canal Networks Using Labour - Intensive Approach – Meryata – Zgharta – North Lebanon
UNDP
Construction of Irrigation Canal Networks Using Labour - Intensive Approach – Meryata – Zgharta – North Lebanon
Leb relief
Implementation of Sewers and storm water network
Leb relief
Implementation of Sewers and storm water network
UNRWA
Construction of water tank 500 m3 capacity 37 m height at Shatila Camp.
UNRWA
Construction of water tank 500 m3 capacity 37 m height at Shatila Camp.
UNRWA
Rehabilitation of the existing water system at Rashidieh Camp.
UNRWA
Rehabilitation of the existing water system at Rashidieh Camp.
CISP
Rehabilitation Works in Yanouh well F4 and Construction of a Lift Line(Tyre District – South Lebanon Governorate)
CISP
Rehabilitation Works in Yanouh well F4 and Construction of a Lift Line(Tyre District – South Lebanon Governorate)
ACF
Construction Of Water Distribution Network In Bissarieh, South Lebanon
ACF
Construction Of Water Distribution Network In Bissarieh, South Lebanon
UNDP
Construction of Irrigation Canals and Networks Using Labour - Intensive Approach – Tal Abbas Gharbi and Tal Abbas Charqi – Akkar, North Lebanon
UNDP
Construction of Irrigation Canals and Networks Using Labour - Intensive Approach – Tal Abbas Gharbi and Tal Abbas Charqi – Akkar, North Lebanon
UNDP
Construction of Irrigation Canals and Networks Using Labour - Intensive Approach – Akkar El Atika, Akkar, North Lebanon
UNDP
Construction of Irrigation Canals and Networks Using Labour - Intensive Approach – Akkar El Atika, Akkar, North Lebanon
Tankamel Sawa / Arche Nova
Full Rehabilitation Of Kfarhelda Water Treatment Plant
Tankamel Sawa / Arche Nova
Full Rehabilitation Of Kfarhelda Water Treatment Plant
UNDP
Construction of Irrigation Canals and Networks Using Labour-Intensive Approach – Rahbe, Akkar, North Lebanon
UNDP
Construction of Irrigation Canals and Networks Using Labour-Intensive Approach – Rahbe, Akkar, North Lebanon
CISP
Aarouniyyeh - Majdlayya Extension of the Potable water network(Zgharta District – North Lebanon)
CISP
Aarouniyyeh - Majdlayya Extension of the Potable water network(Zgharta District – North Lebanon)
ICRC
Dinnieh WSS Improvement Civil Works
ICRC
Dinnieh WSS Improvement Civil Works
Tankamel Sawa
Rehabilitation of Bakhoun water Station including pumping line and regional tank
Tankamel Sawa
Rehabilitation of Bakhoun water Station including pumping line and regional tank
Concern worldwide
Construction of 2150m of irrigation canal – Wadi Khaled, Lebanon
Concern worldwide
Construction of 2150m of irrigation canal – Wadi Khaled, Lebanon
UNRWA
Construction of water well 500m deep At Shatila Camp
UNRWA
Construction of water well 500m deep At Shatila Camp
Save the children
Construction of 1000m3 groundwater reservoir in Berqayel LOT NO.302.Studies, design
Save the children
Construction of 1000m3 groundwater reservoir in Berqayel LOT NO.302.Studies, design
Concern worldwide
Design and implementation of Emergency Retention Tank in Mashta Hammoud Village next to Al Kabeer River Akkar, / North Lebanon
Concern worldwide
Design and implementation of Emergency Retention Tank in Mashta Hammoud Village next to Al Kabeer River Akkar, / North Lebanon
Concern worldwide
Construction of Irrigation Channel in Amayer and Hichi
Concern worldwide
Construction of Irrigation Channel in Amayer and Hichi
Save the children
Mashta Hassan Water Network
Save the children
Mashta Hassan Water Network
Save the children
Construction of 500 m3 groundwater reservoir in Debbabyi
Save the children
Construction of 500 m3 groundwater reservoir in Debbabyi
Tankamel Sawa
Full Rehabilitation Of Kousba Water Treatment Plant
Tankamel Sawa
Full Rehabilitation Of Kousba Water Treatment Plant
JICA
Rehabilitation Work of 4 Water Stations in Mount Lebanon
JICA
Rehabilitation Work of 4 Water Stations in Mount Lebanon
INTERSOS
Construction of 500 m3 water resvoir in Hay Selom, Beirut
INTERSOS
Construction of 500 m3 water resvoir in Hay Selom, Beirut
Tankamel Sawa
Replacement of a section in Bakhooun and Bkarsouna Pipeline(Danniyeh)
Tankamel Sawa
Replacement of a section in Bakhooun and Bkarsouna Pipeline(Danniyeh)
Concern worldwide
Implementation of household inspection chambers and pipeline
Concern worldwide
Implementation of household inspection chambers and pipeline
Save the children
Well Materials, accessories and Installation in Debbabyi
Save the children
Well Materials, accessories and Installation in Debbabyi
UNRWA
Rehabilitation of two water wells in Shatila Camp
UNRWA
Rehabilitation of two water wells in Shatila Camp
Construction, Rehabilitation, Revamping & Renovation
Construction, Rehabilitation, Revamping & Renovation
UNRWA
Reconstruction of Nahr El Bared Palestine Refugee Camp Block N8, N6, mosque, and N18 and infrastructure work At Nahr el bared Camp.
UNRWA
Reconstruction of Nahr El Bared Palestine Refugee Camp Block N8, N6, mosque, and N18 and infrastructure work At Nahr el bared Camp.
UNRWA
Reconstruction of Nahr El Bared Palestine Refugee Camp Residential and Non - Residential Units - lot 12(Blocks N31 & 33).
UNRWA
Reconstruction of Nahr El Bared Palestine Refugee Camp Residential and Non - Residential Units - lot 12(Blocks N31 & 33).
UNICEF
Rehabilitation works for 10 public schools located in Bekaa and Mount Lebanon Governorates(Lots #2 and 6)
UNICEF
Rehabilitation works for 10 public schools located in Bekaa and Mount Lebanon Governorates(Lots #2 and 6)
Municipality of Beirut
Construction and Rehabilitation of City Library of Beirut.
Municipality of Beirut
Construction and Rehabilitation of City Library of Beirut.
Municipality of Beirut
Rehabilitation of Beirut municipality Buildings
Municipality of Beirut
Rehabilitation of Beirut municipality Buildings
UNHCR
Construction / Rehabilitation works at UNHCR office in Zahle
UNHCR
Construction / Rehabilitation works at UNHCR office in Zahle
UNICEF
Rehabilitation of Five schools at North Government
UNICEF
Rehabilitation of Five schools at North Government
Beirut Municipality
framework agreement for workers on demand for the Engineering Department and the Classified Institutions Department in the Beirut Municipality
Beirut Municipality
framework agreement for workers on demand for the Engineering Department and the Classified Institutions Department in the Beirut Municipality
ESCWA
Revamping and remodelling of ESCWA 4th floor
ESCWA
Revamping and remodelling of ESCWA 4th floor
LWR
Shelter rehabilitation Beirut Blast
LWR
Shelter rehabilitation Beirut Blast
UNRWA
Finishing Works “N1R3” of 5 buildings at Nahr el bared Camp.
UNRWA
Finishing Works “N1R3” of 5 buildings at Nahr el bared Camp.
UNRWA
Construction of 10 classrooms & 2 offices at Qadisieh / Ein Assal School At Rashidiyeh Camp.
UNRWA
Construction of 10 classrooms & 2 offices at Qadisieh / Ein Assal School At Rashidiyeh Camp.
Islamic Relief
Rehabilitation of tents in Bekaa (Phase 1 and Phase 2)
Islamic Relief
Rehabilitation of tents in Bekaa (Phase 1 and Phase 2)
Islamic Relief
Completion of the construction work and equipping of Hilane Primary School.
Islamic Relief
Completion of the construction work and equipping of Hilane Primary School.
Premiere Urgence
Construction of a new reinforced water reservoirs in Burj El Arab
Premiere Urgence
Construction of a new reinforced water reservoirs in Burj El Arab
UNRWA
Reconstruction and rehabilitation of shelters at Burj el Shemaly Camp.
UNRWA
Reconstruction and rehabilitation of shelters at Burj el Shemaly Camp.
INTERSOS
Rehabilitation of shelters – Emergency response
INTERSOS
Rehabilitation of shelters – Emergency response
Municipality of Beirut
Rehabilitation and maintenance of health center of sabra in Beirut.
Municipality of Beirut
Rehabilitation and maintenance of health center of sabra in Beirut.
Municipality of Beirut
Construction of 13 prefab houses for Beirut guard
Municipality of Beirut
Construction of 13 prefab houses for Beirut guard
Municipality of Beirut
Rehabilitation of Kaskas Garden in Beirut.
Municipality of Beirut
Rehabilitation of Kaskas Garden in Beirut.
Concern worldwide
Implementation of Water and Sanitation facilities(WASH-Project), At Akkar, Lebanon
Concern worldwide
Implementation of Water and Sanitation facilities(WASH-Project), At Akkar, Lebanon
ESCWA
Revamping and Remodelling of ESCWA 5th Floor East Wing
ESCWA
Revamping and Remodelling of ESCWA 5th Floor East Wing
UNRWA
Provision of steel fence around package one and Temporary access for N2 Block at Naher el Bared Camp.
UNRWA
Provision of steel fence around package one and Temporary access for N2 Block at Naher el Bared Camp.
UNRWA
Adaptation works for Aqsa School At Rashidiyeh camp
UNRWA
Adaptation works for Aqsa School At Rashidiyeh camp
UNICEF
Refurbishment of Innovation Labs in Siblin and Naher El Bared Camp
UNICEF
Refurbishment of Innovation Labs in Siblin and Naher El Bared Camp
UNHCR
Civil works At Quobayat
UNHCR
Civil works At Quobayat
Rural Entrepreneurs
Refurbishment of Innovation Labs in Semkaneye
Rural Entrepreneurs
Refurbishment of Innovation Labs in Semkaneye
UNHCR
Painting work at Lea and Khater Building In Beirut.
UNHCR
Painting work at Lea and Khater Building In Beirut.
INTERSOS
Rehabilitation of collective shelters and common areas in falougha, aramoun/urda
INTERSOS
Rehabilitation of collective shelters and common areas in falougha, aramoun/urda
GVC
Rehabilitation works foe BWE offices in Baalbeck – Hermel Governorate
GVC
Rehabilitation works foe BWE offices in Baalbeck – Hermel Governorate
UNICEF
Roof waterproofing works in Omar Faroukh public school, Beirut, Lebanon
UNICEF
Roof waterproofing works in Omar Faroukh public school, Beirut, Lebanon
Demolition and Excavation
Demolition and Excavation
DSG
Demolition and Excavation Greater Beirut Mills project in Naher Beirut with a total volume of 50000m3
DSG
Demolition and Excavation Greater Beirut Mills project in Naher Beirut with a total volume of 50000m3
A.H.Adada
Excavation of Zaatari factory project in Bshamoun with a total volume of 27000m3
A.H.Adada
Excavation of Zaatari factory project in Bshamoun with a total volume of 27000m3
Matta & Associate
Demolition and Excavation Babikian project in Ashrafiye with a total volume of 20000m3
Matta & Associate
Demolition and Excavation Babikian project in Ashrafiye with a total volume of 20000m3
A.H.Adada
Excavation of Karake factory project in Bshamoun with a total volume of 14,500m3
A.H.Adada
Excavation of Karake factory project in Bshamoun with a total volume of 14,500m3
Agricultural Work
Agricultural Work
Municipality of Beirut
Trimming tree in all Beirut Road.
Municipality of Beirut
Trimming tree in all Beirut Road.
Municipality of Beirut
Rehabilitation of Beirut Forest “29.6 hectares.”
Municipality of Beirut
Rehabilitation of Beirut Forest “29.6 hectares.”
Municipality of Beirut
Supply and planting of plants and trees for the municipality of Beirut
Municipality of Beirut
Supply and planting of plants and trees for the municipality of Beirut
Bridges and Roads
Bridges and Roads
Municipality of Beirut
Rehabilitation of El Basta Tahta Bridge
Municipality of Beirut
Rehabilitation of El Basta Tahta Bridge
Municipality of Beirut
Construction of Hawd El Wilayeh Bridge
Municipality of Beirut
Construction of Hawd El Wilayeh Bridge
Municipality of Beirut
Installation of 10000 pieces of Kerb Marker in Beirut Streets.
Municipality of Beirut
Installation of 10000 pieces of Kerb Marker in Beirut Streets.
Security System
Security System
UNHCR
The provision of integrated access control, CCTV, and fire alarm systems including installation, commissioning, repair and maintenance services, relocation, and supply of spare parts.
UNHCR
The provision of integrated access control, CCTV, and fire alarm systems including installation, commissioning, repair and maintenance services, relocation, and supply of spare parts.
Marine Work
Marine Work
Beirut Harbor
Loading and uploading Ships in Beirut Harbor
Beirut Harbor
Loading and uploading Ships in Beirut Harbor
Cleaning, waste sorting, and separation
Cleaning, waste sorting, and separation
Beirut Harbor
Dredging the basin of the Quay No.3 in Beirut Harbor to reach the depth of 12 m for a total area of 7500 m2 to a required a volume of 100,000 m3.
Beirut Harbor
Dredging the basin of the Quay No.3 in Beirut Harbor to reach the depth of 12 m for a total area of 7500 m2 to a required a volume of 100,000 m3.
Beirut Harbor
Cleaning works for buildings and surrounding squares and sweeping of roads, pavements, and collection and transfer of waste at the port of Beirut, Tender No. (8).
Beirut Harbor
Cleaning works for buildings and surrounding squares and sweeping of roads, pavements, and collection and transfer of waste at the port of Beirut, Tender No. (8).
We can also integrate ourselves into a project already in progress and thus offer additional expertise to our clients.