Residential & Non-Residential Buildings

-Construction of residential and non-residential unit in Naher el bared Palestinian Refugees, Camp, Lebanon block N8, N6, N18 and mosque with a total surface area of 22,000 sqm works include:

  • Retaining wall: works include Site Construction, Concrete Works, Thermal and Moisture Protection.
  • 62 buildings and four floor mosque  : works include :Site Construction ,Concrete Works , Masonry ,Metals , Wood and Plastics , Thermal and Moisture Protection , Doors and Windows , Finishes , Specialties , Mechanical , Electrical .
  • Infrastructure and road: works include: Water Supply Network, Sewage Network, Storm water Network, Roadwork’s, and Electrical & Telephone Installations.

-Construction and Rehabilitation works in Zahle with a total surface area of 2,000 sqm works include:

  • site work ,concrete work, masonry, metals, wood and plastic, thermal & moisture protection ,doors & windows , finishes , sanitary fixtures ,  main distribution boards and panels , secondary panel boards , power and control cables, cable trays, lighting points , lighting fixtures, power outlets, switches and push buttons, socket outlets, disconnect switches, grounding & surge protection systems, telephone/data system, TV system , videophone system:, outlets for music system, fire alarm system, cctv system ,elevator, plumbing work, HVAC work.

-Construction of 30 shelters in Burj el shemaly Palestinian Refugees, Camp, Lebanon with a total surface area of 2,000 sqm work include: 

  • Site Construction, Concrete Works, Masonry, Metals, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes, Mechanical, Electrical works and water supply system.

-Construction and rehabilitation of four floor city library of Beirut with a total surface area of 1,600 sqm work include:

  • site work , Concrete work ,footing, Basement Walls 20mm ,Columns jacketing, Slab topping, Slab on grade, Solid Slab, Tie beams, Drop beams and  up stands; Lean concrete , 100mm Steel Reinforcement ,steel escape staircase ( 4 levels ), masonry, metals, wood and plastic, thermal & moisture protection ,doors & windows , finishes , sanitary fixtures ,  main distribution boards and panels , secondary panel boards , power and control cables, cable trays, lighting points , lighting fixtures, power outlets, switches and push buttons, socket outlets, disconnect switches, grounding & surge protection systems, telephone/data system, TV system , videophone system:, outlets for music system, fire alarm system, cctv system ,elevator, plumbing work, HVAC works.

.